1、First, mark the correct position of the outlet nail.This step is to measure the distance and mark the installation point
2、Clean the road surface and keep it clean and smooth. The goal is to clean the road so that solar spikes will stick better when installed.
3、Put glue on the bottom evenly. Keep it in the right direction and press it into the road tightly.
4、Check within 2 hours of installation to ensure that all studs are not installed incorrectly and are not bent or deformed due to compression
5、After 4 hours of installation, the glue will dry completely.
6、 It can also be fixed on both sides with bolts.